News
Zhongmu Will Build an Over-1,000-mu Wetland Park

It is learned on August 15 from the Project Headquarters of Qingxihu Wetland Park at Dongfenglu Street, Zhongmu County that the construction work of Zhongmu Qingxihu Wetland Park invested RMB 249 million, will begin at the end of August. The project will last for two years. This park covers a total area of around 1,195 mu, and is divided into three areas: Normal Water Storage & Viewing Area, Bottomland Rain and Flood Storage Area and Stroll, Rest & Entertainment Area.

The citizens of Zhengzhou will have a new leisure place in Zhongmu two years later. The construction of Qingxihu Wetland Park (a project linking Zhangbagou and Dili Xiaoqing River System) will begin at the end of this month. The park, located to the south of Shangdu Avenue, east of Xinpu Street, north of Zhanqian Avenue, and west of Zhongxing Road, is one of the top 10 key projects of Zhongmu County in 2017. It has an area of around 1,195 mu, among which the river-lake blue line covers 395 mu. The lake is mainly excavated in the area located to the south of Wenbo Road, west of Shengzhou Street, north of Zhanqian Avenue, and east of Xinpu Street.

As the largest greenbelt in the old quarter of Zhongmu County, the project takes “Blue-green Fusion” as its design philosophy, combines the construction concept of “Sponge City”, and takes Zhangbagou and Dili Xiaoqing River System as its ecological base, to achieve basic functions of collecting rainwater resources and reducing regional volume of runoff, as well as the additional function of providing a place for rest and entertainment for nearby residents and students. It is divided into three areas: Normal Water Storage & Viewing Area, Bottomland Rain and Flood Storage Area and Stroll, Rest & Entertainment Area, among which the Stroll, Rest & Entertainment Area has landscape facilities (such as greenways, virescence, small garden ornaments, boardwalks, garden paths and pavilions) and urban furniture (such as public toilets, benches and marks).

The project will begin at the end of August, and last for two years.

It is learned that the project is planned to begin at the end of August, and last for two years. According the plan, RMB 146.38 million is invested for the hydraulic engineering and bridge construction at the first stage, and RMB 103 million is for the landscaping and construction of the park at the second stage. After the complementation of the project, the lake will emerge like a chain of pearls, and citizens will enjoy great pleasure when standing by the lake with their shadows reflected in the water, and appreciating the view of city surrounded by lake.

Copyright by Zhengzhou Municipal Tourism Administration